Finished gluing sunbrella fabric to center trim piece ahead of flap lever. Cutout Naugahyde on center console and test fit headset plugs and USB power plug. Installed rubber edging on cockpit trim panels. All interior trim panels are temp installed at this point and will be removed before final assembly. Moved first Flap to our inflatable paint booth to test fit in paint fixture. Holding fixtures are made so you can cleco a part using the tooling holes on the flight controls and tail feathers or you can bolt to the hinges. Ready to prime flight controls.